EXTREME CABLE MANAGEMENT

Latest
News

GLOBAL OUTLOOK, LOCAL KNOWLEDGE

Understanding Project Requirements

With our advanced manufacturing facilities and extensive warehouse capacity at both our Lisburn and Warrington sites, we’re extremely proud of our capabilities as a UK manufacturer and we have lots of customers here in the UK. However, we also supply on a global scale, and ensuring that the right materials arrive in the correct location on time and with all the necessary documentation requires much more than a standard order fulfilment approach; it demands project management expertise.

Understanding Project Requirements
Vantrunk specialises in providing cable management solutions for all kinds of extreme environments, including the oil & gas industry, petrochemicals, rail and nuclear. The diversity of projects we get involved with leverages the company’s 50+ years of experience but no two projects are the same and different geographies have their own requirements in areas as diverse as customs regulations, import duties, health & safety legislation, climate and compliance, affecting both specification decisions and logistics. One thing that all the projects we supply have in common, however, is that both scheduling and budgets must remain on track, which means our customers have to be able to rely on us to manage every aspect of their requirements.

Project Management Expertise
We work with our customers to understand their needs and specify a solution that fits their requirements, and that solutions-driven approach continues in the way we apply our experience to managing their order through the production, fulfilment and delivery process, anywhere in the world.
We support our customers by:
• Advising on shipping quantities and intervals
• Managing production schedules to ensure product is ready for shipping on time
• Managing inspection requirements
• Packing to meet any customer, carrier or destination port requirements
• Compiling all documentation, including ensuring that the right documents are available, in the local language of the destination if required, and with the right number of copies
By working with customers to understand their site requirements, we can ensure that their shipments are staggered in a way that’s manageable in terms of their local logistics and build schedule, without the risk of any site delays. With the size and frequency of shipments agreed, we can then plan our production schedules and put everything in place for seamless packing, dispatch and transportation,.
And, of course, we also keep customers up-to-speed with progress reports at regular intervals throughout their project, providing complete peace of mind that everything is on track.

Exceeding Expectations
From the oil markets of USA, Kazakhstan and Azerbaijan to the tiger industrial markets of China and Korea, our customer-base is truly global. Our commitment to customers, wherever their project may be, is that they can expect the same level of service from our UK team as they could if we were based on their doorstep.
 

ROTARY CLUB SANTA'S SLEDGE REPAIR

Vantrunk Help Santa Deliver

news story

In the lead up to the festive season, Vantrunk was delighted to be able to assist The Rotary Club of Runcorn by carrying out essential repairs and maintenance to its Father Christmas Sledge.
The repairs ensured Father Christmas' safety during his seasonal travels. Father Christmas is pictured here on his pre - Christmas, sledge test run, during which he stopped at Asda Runcorn on 22nd December to meet excited children and families.
 

MOVEMBER FUNDRAISING

Vantrunk Mo Bros

news story

The Movember Mission is to have an everlasting impact on the face of men's health and pictured are the Vantrunk Mo Bros who collectively raised over £800 during Movember 2013.

NEW FACTORY FIRST ANNIVERSARY

Vantrunk's commitment has never been greater

news story

As the first anniversary in our brand new 100,000 Sq. Ft manufacturing facility in Warrington approaches, our capability and commitment to add value to every customer and project around the world has never been greater. Investment in new machinery alongside greater storage and project marshalling space enhances our capabilities when it comes to delivering extreme cable management to major projects worldwide.

CYGNUS CONTRACT

Vantrunk Land Cygnus Contract

Vantrunk as a sub-supplier to MacLean Electrical have been awarded a major contract to supply their world renowned Speedway Cable Ladder system to the GDF SUEZ E&P UK operated Cygnus Gas Project. Vantrunk will supply their Speedway SW6 Ladder complete with accessories in marine grade stainless steel to ensure the system can withstand the harsh North Sea environment. The award cements Vantrunk’s position as the leader in Extreme Cable Management.

The Cable Ladder will be manufactured out of Vantrunk’s 100,000 sq ft facility in Warrington and shipped to Heerema Fabrication Group’s Hartlepool yard in the United Kingdom where fabrication and commissioning of four topsides is taking place.

The Cygnus project, sanctioned in August 2012, is expected to contribute 5% to UK gas production at peak production (due 2016) – supplying gas to the equivalent to 1.5 million homes in Britain. GDF SUEZ E&P UK is the operator of Cygnus, responsible for ensuring that this valuable hydrocarbon resource is extracted and supplied safely and efficiently. Cygnus gas field is situated in the Southern North Sea within UK Continental Shelf blocks 44/12a and 44/11a in 23m of water