EXTREME CABLE MANAGEMENT

Latest
News

PETROBRAS STARTS UP FPSO CIDADE DE MARICA

FPSO Cidade de Maricá

PETROBRAS STARTS UP FPSO CIDADE DE MARICA

 Brazil’s Petrobras has started production from the FPSO Cidade de Maricá, located in the Lula field, in the pre-salt layer of the Santos Basin, offshore Brazil.

The Cidade de Maricá is a floating, production, storage and offloading unit that produces, stores and transfers oil. The vessel is located at approximately 270 kilometers from the coast, at a water depth of 2,120 meters.

According to Petrobras, with a daily production capacity of up to 150,000 barrels of oil and 6 million cubic meters of gas, this is the seventh major definitive production system in the pre-salt layer of the Santos Basin.

With this additional unit, the pre-salt layer of the Santos and Campos basins already accounts for 35% of Brazil’s oil production.

Vantrunk supplied the cable management systems for the water treatment packages built by Veolia includng the Speedway Cable Ladder and Heavy Duty Cable Tray.

CYGNUS CONTRACT

Vantrunk Land Cygnus Contract

Vantrunk as a sub-supplier to MacLean Electrical have been awarded a major contract to supply their world renowned Speedway Cable Ladder system to the GDF SUEZ E&P UK operated Cygnus Gas Project. Vantrunk will supply their Speedway SW6 Ladder complete with accessories in marine grade stainless steel to ensure the system can withstand the harsh North Sea environment. The award cements Vantrunk’s position as the leader in Extreme Cable Management.

The Cable Ladder will be manufactured out of Vantrunk’s 100,000 sq ft facility in Warrington and shipped to Heerema Fabrication Group’s Hartlepool yard in the United Kingdom where fabrication and commissioning of four topsides is taking place.

The Cygnus project, sanctioned in August 2012, is expected to contribute 5% to UK gas production at peak production (due 2016) – supplying gas to the equivalent to 1.5 million homes in Britain. GDF SUEZ E&P UK is the operator of Cygnus, responsible for ensuring that this valuable hydrocarbon resource is extracted and supplied safely and efficiently. Cygnus gas field is situated in the Southern North Sea within UK Continental Shelf blocks 44/12a and 44/11a in 23m of water 

VANTRUNK LEAGUE OF LADDERS

Win Prizes with Vantrunk's League of Ladders Game

You could be next! Vantrunk is celebrating 50 years by giving away spot prizes, monthly prizes and a trip of a lifetime star prize in the year long Xtreme Challenge. 

League of Ladders is Vantrunk’s online Ladder Challenge. Register today as lucky registrant number 50 will win an ipad mini…

Register Now!

Have you got what it takes to climb to the top! Take up the challenge online or via your smartphone & throw down the gauntlet to colleagues.

2013 CREATIVE CAMPAIGN

Vantrunk Media Campaigns Mark 50 Year Anniversary

To mark its 50th anniversary Year in 2013, Vantrunk is undertaking an extensive media campaign. Watch out for crocodiles, iguanas and polar bears popping up in Xtreme conditions across a spectrum of trade publications throughout the remainder of 2013.

Check out the schedule below and pick up a copy featuring one of our Xtreme creatives when they appear over the next few months:

May - Upstream 
June - Upstream and HazardEx
July - Upstream
August - Upstream, OTI and HazardEx
September - HazardEx
November - Upstream
December - Upstream

HURRICANE PROOF CABLE MANAGEMENT

Testing with the Aircraft Research Association

Vantrunk has always shown dedication to using new and innovative ways to test its Speedway Cable Ladder and Vantrunk Cable Tray to ensure that they can survive in extreme conditions. To this end, Vantrunk’s engineers recently collaborated with the Aircraft Research Association (ARA) to carry out a series of tests on its products.

The tests were carried out using the same wind tunnels that were used to carry out research on illustrious aircraft such as Concorde as well as the Tornado and Typhoon fighter jets. The purpose of the tests was to demonstrate how Vantrunk’s Cable Tray and Speedway Cable Ladder can survive the ferocious wind speeds and extreme conditions that would be produced by hurricane force winds.

Don’t miss the full test report over the coming weeks.