EXTREME CABLE MANAGEMENT

Latest
News

TEESSIDE SUCCESS FOR VANTRUNK

Local supply to local project

TEESSIDE SUCCESS FOR VANTRUNK

We are delighted to confirm the supply of our Speedway SW6 Cable Ladder system to the Teesside Biomass Project in the North East of England via Tecnicas Reunidas of Spain. 

Tees Renewable Energy Plant (Tees REP) is a 299MW biomass-powered, combined heat and power (CHP) plant proposed by MGT Teesside, a wholly owned subsidiary of MGT Power.

If you would like to know how we could help with your next project please contact us at sales@vantrunk.co.uk. 

ROTARY CLUB SANTA'S SLEDGE REPAIR

Vantrunk Help Santa Deliver

news story

In the lead up to the festive season, Vantrunk was delighted to be able to assist The Rotary Club of Runcorn by carrying out essential repairs and maintenance to its Father Christmas Sledge.
The repairs ensured Father Christmas' safety during his seasonal travels. Father Christmas is pictured here on his pre - Christmas, sledge test run, during which he stopped at Asda Runcorn on 22nd December to meet excited children and families.
 

MOVEMBER FUNDRAISING

Vantrunk Mo Bros

news story

The Movember Mission is to have an everlasting impact on the face of men's health and pictured are the Vantrunk Mo Bros who collectively raised over £800 during Movember 2013.

NEW FACTORY FIRST ANNIVERSARY

Vantrunk's commitment has never been greater

news story

As the first anniversary in our brand new 100,000 Sq. Ft manufacturing facility in Warrington approaches, our capability and commitment to add value to every customer and project around the world has never been greater. Investment in new machinery alongside greater storage and project marshalling space enhances our capabilities when it comes to delivering extreme cable management to major projects worldwide.

CYGNUS CONTRACT

Vantrunk Land Cygnus Contract

Vantrunk as a sub-supplier to MacLean Electrical have been awarded a major contract to supply their world renowned Speedway Cable Ladder system to the GDF SUEZ E&P UK operated Cygnus Gas Project. Vantrunk will supply their Speedway SW6 Ladder complete with accessories in marine grade stainless steel to ensure the system can withstand the harsh North Sea environment. The award cements Vantrunk’s position as the leader in Extreme Cable Management.

The Cable Ladder will be manufactured out of Vantrunk’s 100,000 sq ft facility in Warrington and shipped to Heerema Fabrication Group’s Hartlepool yard in the United Kingdom where fabrication and commissioning of four topsides is taking place.

The Cygnus project, sanctioned in August 2012, is expected to contribute 5% to UK gas production at peak production (due 2016) – supplying gas to the equivalent to 1.5 million homes in Britain. GDF SUEZ E&P UK is the operator of Cygnus, responsible for ensuring that this valuable hydrocarbon resource is extracted and supplied safely and efficiently. Cygnus gas field is situated in the Southern North Sea within UK Continental Shelf blocks 44/12a and 44/11a in 23m of water